INSTALLATION OF FZH-SYLOMER® FLOATING FLOOR JACK-UP MOUNTS IN MONTPELLIER MUSIC SCHOOL
Inaugurated in 1886, became the National Conservatory of Music, Dance and Dramatic Art, provides initial and pre-professional training for young artists. Within the Boutonnet district, in the heart of the former Grasset maternity hospital, rehabilitated for the occasion and extended by a modern glass construction, the conservatory will benefit from a total floor area of nearly 9800 m2.
The architect Alain Bretagnolles (Architecture-Studio) designed the new conservatory which offers a plurality of spaces adapted to different practices:
- 13 music training rooms.
- 57 classrooms.
- 10 collective practice rooms.
- 7 dance studios.
- 1 studio dedicated to theatre.
- 1 studio for body arousal.
To cope with acoustic complexity of the building, AVA Acoustic was hired. Floating slabs with FZH-Sylomer® floating slab jack up mounts are used for slab decoupling.
INFORMATION ON THIS BUILDING
The architect Alain Bretagnolles (Architecture-Studio) based in Paris is responsible for converting an old building into a modern conservatory.
ACOUSTIQUE VIVIÉ ET ASSOCIÉS , whose head office is also in Paris, had the responsibility to face the challenge of dealing with the acoustics of a building where silence and music must coexist in harmony!
EIFFAGE was responsible for the installation of this acoustic floating slab on FZH-Sylomer®, with the assistance of a technical team of AMC MECANOCAUCHO present before and after pouring the concrete.
|
|
The technical team of AMC-MECANOCAUCHO participated in the selection of the floating slab support according to the specifications of the Acoustic consultant.
AMC MECANOCAUCHO® follows up acoustic projects from project stage to installation. In order to simplify the positioning of the FZH-Sylomer floating slab jack up mounts, AMC-MECANOCAUCHO uses project Autocad files and positions the jack up mounts on the same Autocad file.
INSTALLATION TRAINING, THE ROLE OF FZH+SYLOMER® INSTRUCTOR .
AMC-MECANOCAUCHO trains your installation teams through an application engineer. This trainer explains the laying methodology and gives all the tips to increase productivity.
VIDEO OF THE FINAL RESULT.