Contact
ico_buscar.svg
ico_cerrar.svg

Subscribe to newsletter

*Mandatory fields

Impressum

APLICACIONES MECÁNICAS DEL CAUCHO, S.A.
S.A. bedeutet Aktiengesellschaft - AG (Format Spanien)
Über APLICACIONES MECÁNICAS DEL CAUCHO Deutschland

Geschäftsführer: Jon Ander Lopetegui Galarraga.
Adresse: Industrialdea zona A - parc. 35, 20159 Asteasu, Gipuzkoa, Spanien.
Handelsregisternummer: A-20101150
USt.-Id-Nr: ESA20101150

Für Anfragen an den Kundenservice: info@mecanocaucho.com

View all news

INSTALLATION OF FZH SPRING+ SYLOMER® JACK UP MOUNTS ON THE CAFÉ CHARBON IN NEVERS, FRANCE

View of one of the rooms under construction at Café Charbon on FZH Spring-Sylomer® Jack up mounts

View of one of the rooms under construction at Café Charbon on FZH Spring-Sylomer® Jack up mounts

Since 1997, Café Charbon has been the main music scene of the Nièvre, in France.

1/22/2020

The coal (Charbon) association works for a non-profit purpose, with free, democratic governance and in the sense of the general interest.

Artistic practices are not reduced to market value, to mere consumer products. They are at the service of education, of a free popular cultural expression, of improving the common living environment where everyone deserves respect and dignity.

Main activities:

  • Music Broadcast
  • Support to local artists
  • Support to creativity
  • Support for training and arts education
  • Cultural action

To cope with acoustic complexity of the building, Salto Engineering was hired. Floating slabs with FZH Spring -Sylomer ® Jack up mounts were used for slab decoupling.

INFORMATION ON THE BUILDING

The architect Éric Arsenault based in Nevers has the responsibility of converting an old building into a modern music scene without losing its originality.

Plan
Fig 1 : View of Café Charbon during works.

SALTO INGENIERIE with headquars in Aulnat, Auvergne, has had the responsibility to face the challenge of dealing with the acoustics of a building where silence and music must coexist in harmony!

CHAUMETTE DUPLEIX was responsible for the installation of this acoustic floating slab on FZH Spring-Sylomer® Jack up mounts, with the assistance of a technical team of AMC MECANOCAUCHO present before and after pouring the concrete.

Plan
Fig 2 : Application engineer checking installation before the concrete slab is poured
Plan
Fig 3 : Application Engineer from AMC MECANOCAUCHO doing slab lifting training

The technical team of AMC-MECANOCAUCHO participated in the selection of the floating slab support according to the specifications of the Acoustic consultant.

Plan

AMC MECANOCAUCHO® follows up acoustic projects from project stage to installation. In order to simplify the positioning of the FZ-Sylomer floating slab jack up mounts, AMC-MECANOCAUCHO uses project Autocad files and positions the jack up mounts on the same Autocad file.

Plan
Fig 4 : Vue d’un des salles avec la représentation des FZH Spring +Sylomer®

INSTALLATION TRAINING, THE ROLE OF FZ+SYLOMER® INSTRUCTOR .

AMC-MECANOCAUCHO trains your installation teams through an application engineer. This trainer explains the laying methodology and gives all the tips to increase productivity.

VIDEO OF THE FINAL RESULT.

View all news